  13. This window is meant to help calculate the amount of money that will be required to carry a construction loan until the takeover loan starts and depreciation can begin. The takeover date is labeled as Occupancy Date.
  14.  
  15. This is the amount of points, fees, and interest to be charged on the construction loan until Date of Occupancy. The formula is: AMOUNT x (MONTHS/12) x INTEREST x 60% + (AMOUNT x PTS) + FEES.
  16.  
  17. This is the number of months that the construction loan will be in effect. It is the difference between the Start of Construction Loan Date and the Date of Occupancy.
  18.  
  19. Enter the fees to be charged for the construction loan.
  20.  
  21. Enter the points to be charged on the construction loan.
  22.  
  23. Enter the interest rate that will be charged on the construction loan.
  24.  
  25. Enter the amount of money that will be borrowed for initial construction.
  26.  
  27. Use this button to void the interest calculation and return to the original window. Select the OK Button to return the value back to the Building Costs window.
  28.  
  29. Select this button to accept the calculation value. Use cancel to void the calculated number.
  30.  